FAM20 Road 6 Plot 15

Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Site report
Illustration
No items found.
Conservation

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Background

Installationof deep storm drains formed a major part of the Al Ain Municipality (AAM)project to upgrade roads and infrastructure in old shabiyaat areas.

Latitude:

24.275541

Longitude

55.772586

Coordinated System:

Surveyed By:

HBL

Surveyed On:

Contractor:

Neighbourhood:

Falaj Al Mazmi

Street Name:

Road 6 "Umm Ad Diliy Street"

Plot Number:

no. 15

Owner

Site Type

part of ghayl falaj

Start of works

December 2020

End of works

December 2020

Learn how we reference architectural elements in sites.

See terminology
Period

Iron Age 1300-300 BCE

FAM20 Road 6 Plot 15

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

Book a visit
No items found.